Customization: | Available |
---|---|
Connection Form: | Welded Connection |
Surafce: | Painting and Hot DIP Galvanize |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Part 1. Our factory:
• Shaoxing Sunshine Steel Structure Co. Ltd lies at 20 kilometers east side of Shaoxing. a city famous for its long history
and Culture The company, located in Jingkou Industrial Zone by the side of NO.104 national road, is a professional enterprise
with grade II certificate on contracting steel structure construction. By the time it has 120 staff members, of which 23 per cent
are technical and managerial workers .The company covers an area of 13,000 square kilometers and the workshop occupies
13,000 square kilometers. The company is mainly engaged in constructing steel structure workshops, stadiums, large markets,
residence buildings, office buildings, bridges and decorative steel structure engineering. It also undertakes the processing and
manufacturing of chemical steel structure and power factories.
Part 2. Product description:
Our product flat pack container house is made by steel frame structure, whose structure adopts cold form with galvanized steel structure consists of three modular part: roofing frame, corner column and floor frame. Each modular part could be combined horizontally or vertically in different form like building blocks.It means flexible and variable to meet your demands.
Part 3. Product process & advanced equipment:
Part 4. Production advantages:
1. Light weight, high strength, 50years durable use, no construction waste.
2. Quality certification ISO:9001:2008
3. Cost considering: time saved, cost saved;
4. Easy move, materials can be recycled used, environmentally;
5. Used widely, used as factory, warehouse, office building, aircraft hangar etc;
6. Structural durabilities, easy maintenance.
1.What's your delivery time? | |||||||||||
Salesman will confirm the time for you, large order should communicate in advance. Normally, delivery time is 30-45days after receive deposit. | |||||||||||
2. Are steel warehouse construction ( made of steel frame ) expensive ? | |||||||||||
The steel structure of our company is economic. Its technology and materials used decreases waste expenses such as wood, decorative stone, brick etc. All the material including the steel frames, wall body and roof for installation are prefabricated during the production process, therefore the labor costs for installation is decreased. | |||||||||||
3. What's the quality assurance you provided and how do you control quality ? | |||||||||||
Established a procedure to check products at all stages of the manufacturing process - raw materials, in process materials,validated or tested materials, finished goods, etc. | |||||||||||
4. If there is a clear service life of your products? | |||||||||||
Under conventional climate and environment, steel structure whole building about 10 years. | |||||||||||
5. Do you offer designing service for us? | |||||||||||
:Yes, we could design full solution drawings as your requirements. We can design complex industrial building like office mansion, super marker, auto dealer shop,shipping mall, 5 stars hotel. |