Customization: | Available |
---|---|
Design: | Support |
Door: | Rolling Door or Other |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Part 1. Our factory:
1.What's your delivery time? | |||||||||||
Salesman will confirm the time for you, large order should communicate in advance. Normally, delivery time is 30-45days after receive deposit. | |||||||||||
2.How to control the quality of your product? | |||||||||||
a. quality of the design: think about possible problems in advance and provide a high quality design solution. b. quality of the raw material: choose the qualified raw material c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection. |
|||||||||||
3. How to deal with quality problems? | |||||||||||
Within the warranty period, we will responsible for all quality problems caused by production. | |||||||||||
4. If there is a clear service life of your products? | |||||||||||
Under conventional climate and environment, steel structure whole building about 10 years. | |||||||||||
5. How can the products adopt to different climates? | |||||||||||
Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure. Strong wind region: improve the wind-resisting ability of the internal structure. Earthquake: use high strength material, improve anti-earthquake ability of the structure. High corrosion region: use corrosion resistant material, or paint anticorrosive coating. |